Charging station in the parking house of Trebic Hospital

Charging station in the parking house of Trebic Hospital

Completion date: Q2/2025

Publicly accessible AC charging stations for electric vehicles have been implemented on the roof of the car park, providing a modern and user-friendly solution for electromobility. Charging is activated and paid for using a QR code via Smart Fuel Pass, allowing you to start charging quickly and securely. The charging stations are integrated into the measurement and control (MaR) technology using the ModBus TCP communication protocol, which limits charging by ¼ hr. maxima. The project provides a reliable infrastructure for electric vehicles in line with the requirements of modern urban e-mobility.

About project

  • Type of installation: public AC charging stations
  • Equipment: 3x Cubish Tower 2x11kW
  • Connection and power control: communication and control with the already established MaR system
  • communication protocols/integrations: using the OCPP protocol to the Smart fuel pass charging network

Cubish Tower

  • Stainless steel
  • 2 x 1.4 – 11 kW
  • AC (IEC 61851-1)
  • 6A – 32A (incremental 1A) or in 7 steps
  • 230V (one phase) / 400V (three phases)
  • 1-phase or 3-phase via mobile app
  • Current protector A-EV (30mA AC, 6mA DC)
  • 230V (one phase) / 400V (three phases)
  • 1300 x 200 x 150 mm (H x W x D)
  • LCD display 7″ / button with LED indication / web application
  • Wifi, Bluetooth, LTE Cat-M, OCPP 1.6, Modbus, TCP, Ethernet, Firmware update
  • Wireless / wired
  • Warranty 4 years
Charging station in the parking house of Trebic Hospital

Photogallery